|
||||||||||||||
|
Build Session 16: Electronics AssemblyThe sixteenth build session (June 4 & 5) was held at Steve's shop in Petaluma. The booster electronics were assembled and the sustainer electronics were fit into the nose. Also, the ground station antennas were assembled. |
|||||||||||||